All Bangladesh
Holy Shab-e-Qadr today
Soon the situation in Chittagong Hill Tracts will be calm: Obaidul Quader
KNF attack to loot money and show capability: RAB
Kidnapped manager of Sonali Bank returns to his family
Home Minister to visit Bandarban tomorrow to inspect situation
BM container depot becoming ICD with maximum security
Own Correspondent, Dhaka, Oct 6: IMDG code experts have been appointed to the BM depot which was destroyed by fire and explosion four months ago. A three-lakh gallon water tank is being constructed inside the depot. A separate shed is being constructed for Dangerous Goods (DG) cargo. In case of a fire accident, the entire depot will be covered in chemical foam within 19 minutes. The premises is being equipped with all such sophisticated systems, which have cost thousands of taka.